We are on the home stretch finishing all the little things that seam to take the most time. Pad storage brackets, toolbox, fenders, body lights. Changing the hoses out from the change over valves to the main control valve bank to increase the oil flow.
I've been hearing some chatter about over heating issues. You guys that are considering buying these grapple saws need to make sure the companies your buying these saws from are up sizing the hoses to 1/2". It's only the two hoses that are used to operate the saw itself, it requires a min of 11 GPM to properly rotate the saw blade. 1/2" hose will flow 12 GPM. 3/8" hose will only flow 7 GPM so if they upsize the spool 11 or 12 GPM in the main control valve and don't change the hoses this will cause a heating issue. 3/8" steel pipe and fitting will flow 12 GPM 1/2" steel fitting and pipes will flow 19 GPM. Make sure your getting at lease 90 to 100 gallon hydraulic tank the larger the tank the better.
I've been hearing some chatter about over heating issues. You guys that are considering buying these grapple saws need to make sure the companies your buying these saws from are up sizing the hoses to 1/2". It's only the two hoses that are used to operate the saw itself, it requires a min of 11 GPM to properly rotate the saw blade. 1/2" hose will flow 12 GPM. 3/8" hose will only flow 7 GPM so if they upsize the spool 11 or 12 GPM in the main control valve and don't change the hoses this will cause a heating issue. 3/8" steel pipe and fitting will flow 12 GPM 1/2" steel fitting and pipes will flow 19 GPM. Make sure your getting at lease 90 to 100 gallon hydraulic tank the larger the tank the better.