- Location
- St. Paul, MN
I use 11mm KMIII in SRT for ascent with ascenders, descent with i'D, and work positioning with i'D.
I use it DRT for the secured footlock technique and descent with a figure 8 or similar device.
I would not recommend KMIII for use in DdRT (dynamic, closed system, running -whatever you want to call it-). The rope doesn't knot well (as mentioned above) and over time it becomes quite stiff and even harder to knot. I think you're asking for a difficult time if you use it as an arborist climbing line. It simply was not designed for use in that configuration.
I use it DRT for the secured footlock technique and descent with a figure 8 or similar device.
I would not recommend KMIII for use in DdRT (dynamic, closed system, running -whatever you want to call it-). The rope doesn't knot well (as mentioned above) and over time it becomes quite stiff and even harder to knot. I think you're asking for a difficult time if you use it as an arborist climbing line. It simply was not designed for use in that configuration.