I was threre for a bunch of the footage I believe you're referring to, post #143, all the clips with newer blue sided, blue slung Morgan Block. Also for the Euc limbs and wood using the older all silver MB.
That was Lawrence Schultz doing all the hard and smart work. We had a smallish landing zone on the side of a hill that quickly went to 45°. Dome the limbs he was dealing with were whippy 40 and 60 foot long limbs over the house and ocean winds were slated to be coming up to mid 20's mph.
I loved how fast he was getting material down to me and soon that he was even willing to stay up in the tree and work under those conditions.
Why would he/we have wanted to span rig some of that? Or another way of looking at it is, what more would we have accomplished? (Sincere question.)