Tr33Climb3r
Participating member
- Location
- Wisconsin
We originally tried to use our loader because that's how we installed them but for some reason I couldn't get the stairs to release. So pulled the truck to about 20' outside of the building and stretched her in. Lifting straight up at the hook location was the key. The bottom we floated on a pallet jack so we wouldn't scrape up the floor.Hey Casey, that looks like a video worthy project. Seems amazing to me you’d have any capacity at all What’s the new Arbsession location look like?
So this old location (for arbsession) is actually a portion of my tree service's building. This is a 40x60 area. Arbsession is now in an 8,000 sq foot building. Only downside to this new building is we only have 13' tall walls with a max peak at the center around 20' between the beams. My tree service building has 18' tall ceilings flat which was much nicer.
Arbsession is in a temporary building. We have sights on a 30,000 to 40,000 sq foot building.
















