Rigging with a 3 man crew

I don't think I'm quite getting the full benefit of my GRCS yet! These pics help to show how reserved with it I'm being so far. Have started lowering much bigger peices recently but must have some way to go to reach its max potential. One step at a time though, I'm in no rush.
 
Rupe,

These machines are mean, but all of the ingredients must be right for such big cuts. The rope, blocks, slings, design of the system and of course the tree. After that, all you need is a smart enough crew to work out the plan.

Take it slow by all means. I'm not showing you all of the small cuts or small trees. There's plenty of those too. But why wait for those to upload?
 
I have noticed if you do not put the rope brake on and take off the winch for butt hitching you tend to burn the sheathes of the rope because of the friction on the winch have you guys seen this?
 

New threads New posts

Back
Top Bottom