We used 7 load lines to stabilize the load 4 of them going to GRCS,s. We lifted it up to releave all of the tension. I had to peice out a little brush Them Me and oune other climber made 4 aerial cuts. We only had 2 ground men.
Good job. Doing a complex job like that with the staff you had is a compliment to the training and depth of education you have in your team. That isn't a job that anyone could do with an inexperienced crew.
Thanks Tom. We had a great crew. Having the 4 GRCS,s made it possiable for the 2 ground men to handle the load lines. They could raise one line while lowering and drifting another at the same time. It took around 2 hours to set up all of the rigging and 45 minutes to get it on the ground.