Speedline upcoming

I set a lead line today with my BS, plan to use it to rig a speedline tomorrow for a tree in my back yard...junction of 2 fences, driveway and house means I need to drift limbs and trunk pieces of a smallish gum towards the open-er back yard. The top of the main lead is rotten and broken off at about 30 feet. A limb became the "takeover" lead, about 3 feet below the rotten part, and now goes up to about 50 feet. I'm concerned that as it gets larger it will split off...towards the house.

I'll go up that lead, use a block to top a 10-12 foot piece and then transfer it to the speedline. I plan to tie into two (somewhat) nearby trees...the junction of the trunk and the high lead looks solid but I am not sure how much to trust it. The limb is about 10-12 inches where it joins the trunk. I'll get some pictures.
 
Good suggestion..I will re-look with that in mind. Won't happen today, though...I got at call at 8:15 this AM and a friend had their cat stuck in a tree at 30' all night. Started setup at 10AM and took 'til noon to get Miss Evie down.

Maybe speedline tomorrow.
 

New threads New posts

Back
Top Bottom