evo
Been here much more than a while
- Location
- My Island, WA
There has been alot of talk about bridges here lately and it's motivated me to replace mine. Not due to wear but it was too long.
I have some arbormaster rope that I just replaced the bluemoon that I had for a bridge on my harness (sequoia).
I had a thought that I'd like to try but want input 1st. Is it acceptable and safe to take the core out and just use the cover for the bridge? We do it for splice's right? It's a cover dependant rope construction, and the core is there just to hold shape, Correct?
So what is every ones thoughts?
I have some arbormaster rope that I just replaced the bluemoon that I had for a bridge on my harness (sequoia).
I had a thought that I'd like to try but want input 1st. Is it acceptable and safe to take the core out and just use the cover for the bridge? We do it for splice's right? It's a cover dependant rope construction, and the core is there just to hold shape, Correct?
So what is every ones thoughts?