Report Writing

Matias

Been here much more than a while
Location
Silicon Valley
Those of you that do a lot of report writing:

How long did it take you to get efficient enough at doing this?

I already finished the report that spurred this question, but if you were asked for a bid for a pre-construction report for a project inbolving construction of five different features, involving 135 trees, a quarter of which conflict with the proposed construction, and including tagging the trees after inventory, how many hours would you bid it for? The property was approximately 8 acres, and the inventory involved five areas spread around the place.
 
I would bid an hourly amount, because projects like these seem to change shape and size once you get into them. One contact describes it one way, but plans or conditions change and suddenly the scope and what you’re needing to do changes quite a bit. Sounds like a fun project with lots of moving parts.

In the interest of spitballing, I’m wondering how many hours you ended up on this project- somewhere around 20?
 
I bid it for 42 hours, but got it done in 34- it was my first project like this, and I had to re-do a number of things- so the company made some money, and that was the winning bid, so I don't feel bad about it.

It did have more moving parts than expected, and I see how it might not always work out like it did. I will definitely think about what you're saying
 
Last edited:
Ugh that’s a lot of trees and tree conflicts. Personally I break it down to field work and desktop work. I always under estimate the desktop side of things, and shoot myself in the foot.
I’m slow and methodical, there is a reason I’m primarily a climbing arborist.. I’ll spend half a day yelling at the screen for moving photos or reformatting. Never mind the grammar or broken sentences.
If you got it done within 30 hours it would have taken me 80..
 
Those of you that do a lot of report writing:

How long did it take you to get efficient enough at doing this?

I already finished the report that spurred this question, but if you were asked for a bid for a pre-construction report for a project inbolving construction of five different features, involving 135 trees, a quarter of which conflict with the proposed construction, and including tagging the trees after inventory, how many hours would you bid it for? The property was approximately 8 acres, and the inventory involved five areas spread around the place.
Data is going to be best.
Log all your time.
 
Data is going to be best.
Log all your time.
My problem is I don't have the patience/discipline to sit in front of the computer for 5 hours and do one thing. So sure, I just spent 5 hours working on this report...and checking TreeBuzz, going to the fridge, buying something on Amazon, shopping for a new truck, ohh squirrel! Probably should work on that report more...eh, it's not due until next week....maybe I'll go out to the garage to work on something.
 
My problem is I don't have the patience/discipline to sit in front of the computer for 5 hours and do one thing. So sure, I just spent 5 hours working on this report...and checking TreeBuzz, going to the fridge, buying something on Amazon, shopping for a new truck, ohh squirrel! Probably should work on that report more...eh, it's not due until next week....maybe I'll go out to the garage to work on something.
I have the same problem, which is why it does take me longer than it "should" take me, on top of the fact that I had nobody to teach me their way of planning, things to remember to do, ways of organizing different kinds of information, etc. I just had to figure it all out, and it has been mentally exhausting. I have only handfuls of reports that resemble one another still; keep changing a lot of formatting and layout things.

Keeping track of billable hours is so hard when my mind wanders so much at the computer; not like climbing where the demands of the situation keep my brain firmly on track. I find myself often only feeling like I can bill for half the time I was just at the computer because I let myself start researching some tangential element that doesn't apply to that particular project; might have learned useful info, but not applicable to that job, so it feels unfair to put that time on that project.

Luckily, I am figuring this out on someone elses dime, and they fully believe in my ability to become really great at this, but I have every intention of going out on my own eventually, so it means a lot to me to get good at this part of the job quickly. I really appreciate the reminders that I don't actually suck at it, even if I'm not as good as I want to be.

Thanks guys.
 
Last edited:
Standard shorthand abbreviations helps. Standard sequence helps.

Data charts/ forms help.


For example for bids

1. 26x100, df, P.,cr to 35', haul

2. 20x80, wrc, codom, IBC (or IBU IBU toward structure, R. 16" rounds, chip on ground.

3. 18x80, Mad(-rona, not -aple), monitor.

4. 36x100, M, ibc, GA (Ganoderma applanatum), R. 16", chip
 
In writing, I provide an hourly rate that applies to travel, site work, and desk work, and is for typical work. I use the word typical because if you end up in a court room the hourly fee should be greater. I suggest a not-to-exceed amount that well-exceeds what I expect for the project. I provide verbal estimates of how much time it may take, and note that the unique conditions that present themsrlves can change that estimate quite a bit. You should use AI for the written sections.
 
Thanks for sharing the detail on this one — 135 trees across eight acres is a useful example of how quickly the fieldwork adds up. I have found that timing the different stages separately helps a lot: the walkover and data capture, then the plan check and writing up. It makes the next similar bid much easier to judge, because you can see which part took longest rather than guessing at one overall figure. A short template with the same headings each time also saves a surprising amount of time once you have used it a few times. Good luck with the bid — it sounds like a good project to learn from.
 
I use an AI microphone when meeting with clients, doing consultations or cataloging trees. It records everything being said and then generates reports for me. Then I read through what’s been generated and adjust it accordingly. It saves me hours of work and I’ve found that I miss less details (i.e. when the client says, “Can you prune that one branch on this tree while you’re here removing this tree on the other side of the yard?” I quickly agree in person but forget to note it on paper and it gets forgotten. Then i have to make an extra trip to go back and get it later‍♂️.)
 