PINE BEETLE RIGGING REMOVALS

THIS IS GOING TO BE A LONG PROCESS OF RIGGING REMOVALS IN ARROWHEAD AND BIGBEAR .CRANE REMOVALS ARE EASY AND I WOULD LIKE TO HEAR FROM ANYONE WHO IS USED TO RIGGING DOWN PONDEROSA AT LEAST FOUR FT. DIA AT 100 FT. ON TECHNIQUE . Examples of minimum rope diameter, kinds of blocks and which lowering devices .etc.........let the chunks fall................robdog
 

New threads New posts

Back
Top Bottom