Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I had a job like that last week. The guy had sent me pictures, once again impossible to judge the scope of a project from some pictures. Then he said that his stove had a maximum length of 18". I cut in half what I could. He also has a fireplace. I've never had a woodstove with severe limitations.Hourly rate.
Explain that different people need and want wood processed differently.
I've had 10" lengths up to 22", 8" to 40" diameter rounds to split For personal stoves. Each person needs something different from different material.
$30 an hour to stack firewood seems terribly cheap to me, it doesn't cost you any less to be there if you are stacking versus splitting, you still have to pay for the machine, so you should charge the same hourly rate.I don't usually do stacking, if they want it I figure $30 an hour as a courtesy. Most tree guys don't do log splitting for customers because they are always thinking in terms of what the cash value of a cord is--and if you charge $200 to split a cord they're thinking they could buy dry wood by the cord for a little more not thinking about the reality that they can't get rid of the wood usually.
On this job they have quite a few cords of wood once the wood is split. The pictures looked like 1 1/2 cords to me or so. The reality is probably 4-5 if everything was split up. I indicated 4 hours minimum. I ended up doing 5 hours got paid for the machine time, I did not press it as the lady was hoping to get everything split up and stacked. I called her when I was 1/3 done to let her know what we were dealing with and she was ok with that.
I remember hearing John Ball say:Possibly from TB, I heard people are willing to pay more for something they can't do themselves.
...
agree - 100%. Sure, the splitter is worth something, but not $45 per hour.$30 an hour to stack firewood seems terribly cheap to me, it doesn't cost you any less to be there if you are stacking versus splitting, you still have to pay for the machine, so you should charge the same hourly rate.
...
Yes, that's it! Dr. John Ball at an ISA conference.I remember hearing John Ball say:
People will pay for something they can do, but don't want to
People will pay more for something the think they could do, but don't have the equipment to do (this is what you are saying, I think)
People will pay the most for something they don't know how to do.
