So the load cell should have told him what kind of tension he had on it if it were operating properly. So why was it over there tension? I don't understand did it malfunction? Have you had any close calls like this before? I have never done crane work and would unless the operator and I had along safety talk that I understood. Then I would have no problem with it. Its definitely efficient. Some where on you tube I ran into a video where they were taking a HUGE Redwood down in a tight neighborhood. The climber was using 3120 the entire time. Cool video any. But that was also a huge crane. I would suggest to your boss that he get that load cell calibrated. Maybe he would do that. I'm glad that the bar and chain were the only thing damaged. But I would think twice about using that crane again with that load cell. Just my 2 cent's I can't stand the idea of a climber getting hurt and I do plenty of dumb things and get lucky!!
Ted
 
TJG, I like your advise. This crane op sounds like he needs some data driven decision making.

From what I know from the OP, this crane doesn't have a load cell or LIM.

That said, I don't know anything about cranes.
 

New threads New posts

Back
Top Bottom