KentuckySawyer
Participating member
- Location
- Louisville
I don't like the speed part of Speedlines, so in general I would always prefer setting up a another anchor point where you can dump the rigged piece and then ease that into the "Slide Line." That first rigging line becomes a brake line and a haul back line. More stuff going on, but removes some of the "I hope this works" thoughts before you pull the trigger.
Last edited: