spar poles

Location
IN
Alright the risk management people here at school have decided that our springfest kids climb is to dangerous, so we are going to put on a mini- stihl games show that only us in the department would participate. The quiestion I have for you guys is how deep does a 12" dia. pole with 30 feet (9 m) need to be buried and would it need cabling at the top?
 
Contact ACCT to find their specifications

Association of Challenge Course Technicians

This is the group that oversees challenge course installation and inspection. I've worked with their standards committee and they have as dedicated a group of professionals as there are at TB.
 
Up at Pual Smiths College we did a job there when I worked construction and we put in 4 spar poles. After a soil test which turned up mostly sandy loam we put in at 8-10 feet in the ground after ordering new poles to meet with the height they wanted. Yes contact ACCT for the specs we did and that was the requirements.
 

New threads New posts

Back
Top Bottom