TheTreeSpyder
Branched out member
- Location
- Florida>>> USA
Had another problem 2x; where 5-10# 'log' walked end over end to cause damage.
One at the end of a very tough, but well executed massive Live Oak limb damaged over a house seemed no one else wanted to do because couldn't get a crane in to fancy house on city's favorite large lake . Almost done ;15' clear of house worked over all day, 2' piece walked end over need like a cartoon, right up to and hopped thru $600 plate glass window like it was just designed to happen.
.
The other was less dramatic walk distance etc. but actually walked up a few stairs end over end, and dented side panel on house trailer. Rest of trailer a bit dinged, so after initial shock looked like nothing the next day. But was really crazy watching the 'impossible' happen in slow motion like a cartoon as shook head cussing.
One at the end of a very tough, but well executed massive Live Oak limb damaged over a house seemed no one else wanted to do because couldn't get a crane in to fancy house on city's favorite large lake . Almost done ;15' clear of house worked over all day, 2' piece walked end over need like a cartoon, right up to and hopped thru $600 plate glass window like it was just designed to happen.
.
The other was less dramatic walk distance etc. but actually walked up a few stairs end over end, and dented side panel on house trailer. Rest of trailer a bit dinged, so after initial shock looked like nothing the next day. But was really crazy watching the 'impossible' happen in slow motion like a cartoon as shook head cussing.










