[ QUOTE ]
the crane is attached to the top of the tree and the tree is cut at ground level.
capacity on crane shows peice is at 70% capacity (because butt end is still on the ground and ground is holding some of the weight).
What I was saying was, you can lay down a much bigger, heavier load, then you could ever possibly lift.
I do it all the time and the capacity never goes over 100%.
[/ QUOTE ]
That was how I understood it. I don't see a problem with that either.
the crane is attached to the top of the tree and the tree is cut at ground level.
capacity on crane shows peice is at 70% capacity (because butt end is still on the ground and ground is holding some of the weight).
What I was saying was, you can lay down a much bigger, heavier load, then you could ever possibly lift.
I do it all the time and the capacity never goes over 100%.
[/ QUOTE ]
That was how I understood it. I don't see a problem with that either.