Jeff_Cochran
New member
- Location
- Memphis TN
with the boom folded backwards why do they need another crane the damage is already done. like i said some 20 ton rolling blocks, a welder, some 1" plate, a torch, some back guys, 6 experienced bull rigging industrial iron head boomers from Houston Tx, a tugger, 4 operators: one for the favco, one for the tugger, one for the hydro, one for an industrial forklift; a variety of up to ten ton rigging and hand tools, 4 truck drivers with day cabs and 40' flat beds, a 10 ton industrial forklift and a 100 ton hydro in the laydown yard. hazard cleared one day, crane dismantled a week or less maybe with traffic in new york. i'll bump up the price $350,000. Call me I'll make it happen ;-)
edit:
it is new york so make it $550,000 for paid off city, state, traffic control, and union officials; plus the high rent on the close off-location lay down yard and food/hotel/travel cost
edit:
it is new york so make it $550,000 for paid off city, state, traffic control, and union officials; plus the high rent on the close off-location lay down yard and food/hotel/travel cost