4th year climber here, and new to the boards, my first post. Recently added a few things to my saddle. This is my new base setup. Slings and rigging gear go on the left Caritool as needed. The red rope is a 30ft short line and is somewhat of an intermediate replacement for using my 160' and 80' ropes to double crotch and will be used as needed as well. Ill prolly drop the grigri and footloop if im not doing a RADS ascent, and false crotch im not chunking down alot of spar. Only thing left is a larger diddy pouch that the medkit, foot ascender, throwline, and odds n ends will go in. I usually have a camel back on for water and suspenders if im rockin a full size saw for awhile. What do you guys think?





Last edited:










