Steve Connally
Been here much more than a while
- Location
- Suffolk, Virginia
Cool our booms will be twinsies
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
What's the said and done cost for an average build like this chassis included? And build time?Haha yeah. This has been the most excited I've been about spending money (a lot of money).
Word! Did I see you say yours is going to be 26-28' long?Flat bed. I have no desire to haul anything but me and my lunch box.
Nice, at this point what's a couple of grand? Get it now. What's the price point on the basket?Yes. Fairly short. Rear mount. As short as I can get it.
https://static.palfinger.com/medias/sys_master/8797671915550/PK_50002_engl.pdfDoes anyone happen to have the load chart for the pk5002 at hand? We run a stick crane and though production is unbelievably high I feel like at some point this in inevitable and I need to start planning for it to stay ahead of the curve in my territory.....
Here is what I'm still trying to figure out on palfinger's chart, you can do 5100 at 48' without the jib...and 2200 on jib with main boom fully extended (and jib collapsed) at a total of 54'. What weight can you lift with the jib (when everything is fully collapsed)? Or is 2200 your max anytime using the jib.PK50/PJ10 chart.
View attachment 45801