So last Friday we were left at a job that should have taken half a day. Turned into a full late day with about $1000 of extra cutting we didn't get paid for. Our customer gave a check half way through. It was cashed before we were done, and the customer came back with the estimate sheet that had two words I could not read and a map that was not even accurate. I like the people I was working for, but we were taken full advantage of and I was just about to loose my 'S' word. Even beer hasn't tasted the same since. I wish I could make the sales guy understand the estimate sheet is a legal document that CAN NOT be half assed.