[QUOTE="I am wondering a little though, Where you guys getting fancy with the rigging just for the sake of the video and showing how awesome those rings are? Do you feel the tree could of been done faster done a simpler way? just curious if you had a 2nd job to get to if you would have still set up all that rigging.[/QUOTE]
Good question, I wonder that stuff too when I see some videos of work.
It was a very long day, I left Maryland at like 4am maybe got to NY and started on the tree at 8:30 am. It was A LOT of tree and no time to dilly dally. The day was cloudy and dark, lots of shots couldn't even be used. Limbs and plenty of work was missed in that video because it didn't turn out well on film. We finished the tree up around dark, 8:30pm. I thought Lawrence took a little bit of time placing video cameras, but not much. The rigging was all needed and even if there was no cameras running, I would have DEFINITELY done it the SAME WAY on the rigging.
Here was the ground lay out, the only bit of bad, crumbly concrete was right around the tree. Small patch. As soon as it was safe to actually bomb something, we did and I set the wood up so nothing was going to get broken or roll into the stairs. The curbing was nice and new.
HOW DO I POST A PICTURE ON THIS NEW BUZZ ?????!!!!!!!!!