Steve Connally
Been here much more than a while
- Location
- Suffolk, Virginia
I wanted to throw out the idea of traveling for larger projects. I know all the storm work is done but I'm sure there's plenty of storm related work where a grapplesaw crane would be beneficial. I'm available for projects and would be happy to put together a price for a 5 to 7 day work period. The price would include travel, lodging and a small per diem based on an agreed work day length. Hopefully this would be a rate that would benefit us both.
I'm pushing hard to make this work. 6 weeks of down time and very little work in my market is leading me into slow season in a less than optimum situation. I'm hoping something can develop to at least break even in the hopes things turn around a bit this spring. The alternative is a huge decision that doesn't not come easy so I'm basically making the last sprint to see if I can make the finish line.
If you're interested in an estimate let me
know. Worst thing than can happen is you don't like the numbers. No harm no foul. Hope you guys had a great thanksgiving.
I'm pushing hard to make this work. 6 weeks of down time and very little work in my market is leading me into slow season in a less than optimum situation. I'm hoping something can develop to at least break even in the hopes things turn around a bit this spring. The alternative is a huge decision that doesn't not come easy so I'm basically making the last sprint to see if I can make the finish line.
If you're interested in an estimate let me
know. Worst thing than can happen is you don't like the numbers. No harm no foul. Hope you guys had a great thanksgiving.