Sorry but whats with the one handing? (I see you are new on here so FYI I am a stickler with it, don't take it personal)

Otherwise great job. Why so late with the crane just curious?
 
We had to rig the crane on the shortest rigg possible to keep the other carriageway open and avoid damage to the footpath. On such a short rigg furthestn reach was about 8m from the tops.

We were also restricted to 9.30 to 15.00 for use of any traffic control. The tree was on a steep hill and the crane took well over an hour to sep up. We didn't have the room to crane big tops anyway. So it was 2 days with a crane or rigg the brash down, shorten poles then keep the crane hire to 1 day.

No excuses for 1 handed use, other than I was pushed for time and rushing to drop what I could between traffic light signals. I don't have a better excuse I'm affraid.
 