- Location
- Lexington, KY- USA
On friday I was removing two large eucalyptus trees. The job is scheduled for two days worth of work. The first tree I started on had four leads and I left the tallest as a rigging point for the second tree. At the end of the day there was still part of the second tree left and the rigging point was still necessary for monday. No worries of the gear being stolen (back yard locked no traffic) but what about the rain (it did rain too). How bad is it for the ropes and slings to suffer through a rain storm over the weekend and then be put to the test monday morning? Is it worth the time it saves? No chance of freezing in this case (I am in northern California).