- Location
- Retired in Minneapolis
I've done that when doing rec climbs with multiple climbers. I think one time I had 8 ropes anchored to one choked strap. This allowed everyone to ascend at roughly the same time.
Base anchors are an accepted technique. They can be built and inspected before a climber ascends. I would like to hear a replay of the meeting where this decision was made. What's the justification?
Base anchors are an accepted technique. They can be built and inspected before a climber ascends. I would like to hear a replay of the meeting where this decision was made. What's the justification?










