Re: 100\' Pine Removal
[ QUOTE ]
I'll do the same thing some times, load the crane then pick the wood off at the shop. It saves us time when we lack enough drivers for the big equipment. Do love that crane work though.
[/ QUOTE ]
It used to be hard finding someone with a CDL...now its tough to find people that can drive standards!!!The chip truck we're putting together has an Allison automatic in it.Sues working towards her CDL this winter.
[ QUOTE ]
I'll do the same thing some times, load the crane then pick the wood off at the shop. It saves us time when we lack enough drivers for the big equipment. Do love that crane work though.
[/ QUOTE ]
It used to be hard finding someone with a CDL...now its tough to find people that can drive standards!!!The chip truck we're putting together has an Allison automatic in it.Sues working towards her CDL this winter.