Search results

  1. C

    Log Racks on Crane

    No need for costly log racks, just cut everything into 7.5'-8' lengths and lay across the bed. Load the largest stuff first from back to front and choker loads on top you can fill the full 16' front to back and deck to the underside of the boom. Will hold way more than a grapple truck if loaded...
  2. C

    reason for concern?

    Judging from that pic, I'd cut 3' off the end and re-bind it. Like Mark said, however put the clamp on the tail, rather than the tail & main line. If old clamp is to big buy a smaller one & install. Leave about a 6" tail as well. One clamp should get it as far as I know, have been told...
  3. C

    weight of logs

    http://gear.sherrilltree.com/pdf/weightchart.pdf
  4. C

    long way to the top

    If the crane operator will not allow you to ride on the ball, ride the boom. Most crane booms should have loops at the end of the boom that you can put a rope through, or put a screw pin shackle in one of the jib ears for your rope. The only times we use this method is removeing dead or unstable...
  5. C

    Tree Trimmers & Grounds men Wanted

    Drivers license required, Class B CDL a plus but not necessary. Tree trimmers must have 1 or more years of rope and saddle experience. Grounds men experience a plus, will train willing hard workers. Please note all positions require a drivers license and the ability to drive stick or willingness...

New threads New posts

Back
Top Bottom