Check out this crazy place we worked at for 2.5 days.
We started out the back (carried the log out thru the kitchen) ... and ended in the pool area doing the gums in the decking.
The pool had a liner so no dropping anything in there. It was hard to get some footage but I managed a bit.
4.13mins and 21mb in wmv streaming format
http://www.palmtreeservices.com.au/video/tightaccess.wmv
We started out the back (carried the log out thru the kitchen) ... and ended in the pool area doing the gums in the decking.
The pool had a liner so no dropping anything in there. It was hard to get some footage but I managed a bit.
4.13mins and 21mb in wmv streaming format
http://www.palmtreeservices.com.au/video/tightaccess.wmv










