Just curious, does anybody ever do a Critical Lift Plan for critical lifts?
We required them at my previous work. Had some HUGE cranes performing some awesome lifts. One location had a pair of cranes on site for about a year that were so big, each one required 175 tractor trailer loads to deliver it to the site. Can't recall for sure, but probably 350+ feet of boom.
We required them at my previous work. Had some HUGE cranes performing some awesome lifts. One location had a pair of cranes on site for about a year that were so big, each one required 175 tractor trailer loads to deliver it to the site. Can't recall for sure, but probably 350+ feet of boom.