Hey thanks guys!
Chris, the rope went up to another block maybe twenty five feet higher in the tree, with that, plus the grade change, we ended up with a great angle to pull the spar back. We didn't think an MA was needed, but at the last moment we decided to add a second pull line with an MA just for the extra pull, this is would be the fifth rope. not sure if i have any pics of that one( started to run out of crew at this point).